Lexitoto Lexitoto Aplikasi Lexitoto RTP Lexitoto Situ Togel Online Situs Togel Amanah Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Prediksi Togel Lexitoto Tips dan Trik Slot Gacor Prediksi Togel iLexitoto Lexitoto Vietnam Lottery Syair HK Octagon Lottery Bandar Situs Togel Bocoran Slot Gacor Lexitoto Togel Toto Macau Situs Togel Macau Bambu4d Prediksi Togel Bambu4d Prediksi Togel Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Situs Togel Online Aplikasi Bambu4d Bambu4d RTP Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Lexitoto Bambu4d Bambu4d Togel Macau Togel Cambodia Bambu4d Bambu4d Bambu4d Slot Gacor Slot Demo Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto

SURVEY ON G1-G2 CONTRACTORS AFFECTED BY THE MCO

SURVEY ON G1-G2 CONTRACTORS AFFECTED BY THE MOVEMENT CONTROL ORDER (MCO)

The Construction Industry Development Board Malaysia (CIDB) is conducting a survey to identify the actual number of G1 and G2 contractors affected by the Movement Control Order (MCO) and the number and value of projects involved. The feedback is CONFIDENTIAL and will be used to help small contractors who are also affected by the MCO.

The survey is being conducted because a number of contractors did not disclose the construction work obtained and this resulted in inaccurate information collected by CIDB.

So we hope members will help complete the survey for CIDB.

Please note that the response link will expire today, 11th April 2020 (Saturday). For any concerns, please contact ekonomi@cidb.gov.my

Survey link: https://forms.gle/QhrKerNTjp4AXheQA

 

Download MBAM Circular click here

SURVEY ON G1-G2 CONTRACTORS AFFECTED BY THE MCO | SURVEY ON G1-G2 CONTRACTORS AFFECTED BY THE MCO – Master Builders Association Malaysia

SURVEY ON G1-G2 CONTRACTORS AFFECTED BY THE MCO