STEP-BY-STEP GUIDE TO RESUME OR START WORK IN CONSTRUCTION THIS MCO
In order to help MBAM members who may be feeling a little unsure with the steps that need to be taken to resume or start work in the construction sector this MCO, MBAM has prepared a brief step-by-step guide for your reference.
Also enclosed with this circular are the MCO SOP for construction sector dated 13 January 2021 and Act 446 on Employees’ Minimum Standards of Housing, Accommodations and Amenities (Accommodation and Centralized Accommodation) Regulations 2020.
While every precaution has been taken in the preparation of this step-by-step guide and every effort made, the accuracy of information mentioned in this file is based on the official documents shared by the Government. MBAM gives no warranty and accepts no responsibility or liability for the accuracy or the completeness of the information and materials contained in the guide.
Members may contact MBAM Secretariat for assistance or clarification:
Name: | Ms Loh Mei Ling | Name: | Mr Lenny Lim |
Designation: | Executive Director | Designation: | General Manager |
Email: | ed@mbam.org.my | Email: | mbam01@mbam.org.my |
Mobile: | +6012-321 5377 | Mobile: | +6012-620 5377 |
MBAM would like to take this opportunity to wish all of you be safe and take care of your health.
Download MBAM Circular click here
Download MBAM Step-by-Step Guidelines click here
MCO SOP for construction sector dated 13 January 2021 click here
Download Act 446 regulations 2020 click here