Lexitoto Lexitoto Aplikasi Lexitoto RTP Lexitoto Situ Togel Online Situs Togel Amanah Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Prediksi Togel Lexitoto Tips dan Trik Slot Gacor Prediksi Togel iLexitoto Lexitoto Vietnam Lottery Syair HK Octagon Lottery Bandar Situs Togel Bocoran Slot Gacor Lexitoto Togel Toto Macau Situs Togel Macau Bambu4d Prediksi Togel Bambu4d Prediksi Togel Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Situs Togel Online Aplikasi Bambu4d Bambu4d RTP Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Lexitoto Bambu4d Bambu4d Togel Macau Togel Cambodia Bambu4d Bambu4d Bambu4d Slot Gacor Slot Demo Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Bambu4d Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto Lexitoto

URGENT FEEDBACK REQUEST FROM MBAM MEMBERS ON HOW CONSTRUCTION PROJECT CAN CONTINUE WORK AFTER THE MCO

URGENT FEEDBACK REQUEST FROM MBAM MEMBERS ON HOW CONSTRUCTION PROJECT CAN CONTINUE WORK AFTER THE MOVEMENT CONTROL ORDER (MCO) IS LIFTED

Master Builder Association Malaysia (MBAM) would like to obtain urgent feedback from MBAM members the above subject matter to feedback to Construction Industry Development Board Malaysia (CIDB). CIDB has been tasked to prepare a Standard Operating Procedure (SOP) to allow for construction projects to operate after MCO is lifted. However, the Government is in the opinion that not all projects can be allowed to operate fully after MCO is lifted. As such, Government is looking at the options of opening up construction sites based on:

  1. Partial Opening
  2. Fully Opening

On this note, we would like to get inputs from MBAM members on the followings:

  1. Type of projects to be allowed to operate either as partially or fully.
  2. What are the criteria needed to allow site to operate partially or fully?
  3. Suggestion for SOP from submission of application until approval as well as monitoring of activities. SOP need to address health issues such as social distancing, hand washing, etc.

We hope members can provide feedback as per form enclosed to MBAM for us to consolidate a reply to send to the Government on/before 11.00 AM, Sunday, 5th April 2020. Please email the feedback to Mr Lenny Lim, MBAM General Manager by e-mail to mbam01@mbam.org.my. For further enquiries, you may also call Mr Lenny Lim at +6012-6205377. We apologise for the short notice.

 

Download MBAM Circular click here

Download Reply Slip click here

URGENT FEEDBACK REQUEST FROM MBAM MEMBERS ON HOW CONSTRUCTION PROJECT CAN CONTINUE WORK AFTER THE MCO | URGENT FEEDBACK REQUEST FROM MBAM MEMBERS ON HOW CONSTRUCTION PROJECT CAN CONTINUE WORK AFTER THE MCO – Master Builders Association Malaysia

URGENT FEEDBACK REQUEST FROM MBAM MEMBERS ON HOW CONSTRUCTION PROJECT CAN CONTINUE WORK AFTER THE MCO